Under ConstructionMahaRERA: P51800001585Truth Score™ 80/100 (Grade A)
MONTESOUTH-4
MahaRERA Verified Project

Configurations

2 BHK, 3 BHK

Layout options

Possession

2025-06

Target completion

RERA Carpet Area

846 – 1285 sq.ft

Sanctioned carpet

Inventory Status

134/168 Units Sold (80%)

34 units available

80Grade A

4-Pillar Statutory Truth Audit

Multi-Axis Radar

High Credibility · Low to Moderate Risk · Statutory Approvals Intact

This Project
MMR Benchmark (70)
Legal & Title Cleanliness (20/25)Timeline Honesty (17/25)Construction Velocity (20/25)Financial & Escrow Health (23/25)

Pillar-by-Pillar Verification

Legal & Title Cleanliness20 / 25 pts
Performance: 80% of statutory ceilingSuperior Protection
Timeline Honesty17 / 25 pts
Performance: 68% of statutory ceilingStandard Compliance
Construction Velocity20 / 25 pts
Performance: 80% of statutory ceilingSuperior Protection
Financial & Escrow Health23 / 25 pts
Performance: 92% of statutory ceilingSuperior Protection
Statutory Buyer Negotiation Levers

34 unsold units remaining in the project. High leverage for parking/floor-rise waiver.

Verified Green Flags (7)
  • ✓Completed and signed off as per target 2025-06-29.
  • ✓Active construction pace: 68.6% physical completion.
  • ✓Certified Advocate Legal Title Report filed.
  • ✓Sanctioned building layout plan approved by municipal authority.
  • ✓Clean legal record: Zero court litigations disclosed.
Noted Statutory Caveats (2)
  • !Statutory project extension certificate applied with MahaRERA.
  • !Commencement Certificate (CC) document missing or pending.
Statutory Buyer Due Diligence Dossier

Instant statutory audit with advocate title verification, Section 4 escrow bank account, and litigation history.

Download Audit Report (PDF)

Statutory Legal Title & Litigation Audit

Mandatory disclosures under Section 4(2)(l) of Real Estate (Regulation and Development) Act.

Clean Legal Record (Zero Litigations)

Clean Legal Title Disclosed

Zero pending suits, encumbrances, or court proceedings have been filed against MONTESOUTH-4 under MahaRERA Section 4(2)(l). Title certificate verified by accredited legal advocate.

Promoter Legal Entity

Statutory corporate identity under Companies Act / LLP Act.

Legal Name:SWAYAM REALTORS & TRADERS LLP
Organization Type:Partnership
Registered Office:

1798, 1841, 16/1840, BABURAO GANPATH MARG

Section 4(2)(l)(D) Escrow Account

70% buyer receivables held in designated trust account.

Designated Bank:HDFC BANK
Branch IFSC:HDFC0000015
Account Status: Active RERA Escrow
Branch Address:

RATAN GALAXIE JUNCTION OF J N RD AND GOSHALA RD MULUND WEST

MahaRERA Audited Inventory Disclosures

Interactive Unit & Floor Stacking Plan

Inspect real-time booked vs available statutory units, exact RERA carpet areas, and floor placements directly reported by the promoter.

Available Unit
RERA Booked
Total Sanctioned Units

168

Statutory layout capacity
Available for Booking

34

Immediate inventory
Officially Booked

134

Agreements registered
Absorption Velocity

80%

28F
27F
26F
25F
24F
23F
22F
21F
20F
19F
18F
17F
16F
15F
14F
13F
12F
11F
10F
09F
08F
07F
06F
05F
04F
03F
02F
01F

Inventory Absorption & Sales Velocity

MahaRERA Audited

Real statutory unit booking progress registered in public government filings.

Booked (134)
Available (34)
80%Units Sold134 of 168

34 Units Remaining For Selection

Absorption Velocity: High Demand

Configuration-wise Absorption

3 BHK· ~1206 sq.ft
56/88 sold64%
Available: 32 unitsLeverage: High Choice / Negotiable
2 BHK· ~883 sq.ft
78/80 sold98%
Available: 2 unitsLeverage: Fast Depleting

Direct Government Data Advantage:Unlike developer sales brochures that often report artificial scarcity ("90% sold out"), this graph shows verified unit allocations registered under MahaRERA statutory Section 4 disclosures.

64%Physical

Physical Milestone Timeline (S-Curve)

Active Construction

Target Possession: 2025-06 · Verified statutory engineer progress.

Cumulative Earned Value Progress (EVM)
Actual Pace (64%)
Planned S-Curve
0%25%50%75%100%Foundation & PlinthMid-Tower SlabsPlaster & MEPStatutory OC / Possession

Moderate Progress: Enclosure & MEP Finishing Pending

Physical progress is weighted scientifically using civil engineering ratios: Substructure (15%), Superstructure (35%), Envelope & Finishing (30%), and MEP / Final OC (20%).

Physical Construction Activity Breakdown

Statutory stage-wise engineering completion filed under Section 4(2)(l)(D).

Overall Velocity:64%

Excavation

100%
Phase Status:Completed

Basement

100%
Phase Status:Completed

Podiums

100%
Phase Status:Completed

Plinth

100%
Phase Status:Completed

Super Structure Slabs

100%
Phase Status:Completed

Internal Walls & Plaster

35%
Phase Status:Active In-Progress

Sanitary Fittings

0%
Phase Status:Scheduled

Staircases & Lifts

100%
Phase Status:Completed

External Plumbing & Water Proofing

0%
Phase Status:Scheduled

Common Amenities

0%
Phase Status:Scheduled

Sanctioned Towers & Delivery Targets

Official building wings sanctioned by planning authorities.

Tower 11 Wing

MONTESOUTH PILATUS-1

Target Delivery: 2025-06-29

About the Project

MONTESOUTH-4 by Swayam Realtors & Traders is an official statutory MAHARASHTRA RERA registered development (P51800001585). High Credibility · Low to Moderate Risk · Statutory Approvals Intact.

Amenities & Infrastructure

Water conservation/rain water harvesting/recharge of ground waterGymFire protection and fire safety requirementsClub HouseLiftsIndoor Sports facilitySwimming PoolInternal Roads & Footpaths

Floor Plans & Sanctioned Blueprints

Official municipal sanctioned layout drawings filed with MahaRERA.

2BHK934 sq.ft (86.83 sq.m)
Sanctioned BlueprintLAYOUT-1.pdf
2BHK848 sq.ft (78.87 sq.m)
Sanctioned BlueprintLAYOUT-1.pdf
2BHK853 sq.ft (79.3 sq.m)
Sanctioned BlueprintLAYOUT-1.pdf
2BHK931 sq.ft (86.54 sq.m)
Sanctioned BlueprintLAYOUT-1.pdf
2BHK846 sq.ft (78.64 sq.m)
Sanctioned BlueprintLAYOUT-1.pdf
3BHK1,272 sq.ft (118.21 sq.m)
Sanctioned BlueprintLAYOUT-1.pdf

RERA Statutory Document Vault

164 authentic public government disclosures filed under Section 4.

Q1_AC_Form-1_Pilatus-1_2022.pdf

Q1 Ac Form-1 Pilatus-1 2022

Form 2 Engi Certificate Monte South Pilatus-1- Jun 2025.pdf

CA Certificate (Form 3)

Q3_AC_Form-1_Pilatus-1_2023.pdf

Q3 Ac Form-1 Pilatus-1 2023

Form 3 Ca Certificate Pil-1 Dec 2023.pdf

CA Certificate (Form 3)

Disclosure Sold Unsold Inventory Pil Sep 2023.pdf

Disclosure Sold Unsold Inventory Pil Sep 2023

Q2_AC_Form-1_Pilatus-1_2023.pdf

Q2 Ac Form-1 Pilatus-1 2023

14.pdf

Sanctioned Building / Layout Plan

Pilatus 1 RERA Eng Cert Sep 2022.pdf

Pilatus 1 Rera Eng Cert Sep 2022

Disclosure of Sold Unsold Pil 1 Sep 2022.pdf

Disclosure Of Sold Unsold Pil 1 Sep 2022

Form 3 CA Cert PIL-1 Sep 2022.pdf

CA Certificate (Form 3)

Q3_AC_Form-1_Pilatus-1_2022.pdf

Q3 Ac Form-1 Pilatus-1 2022

pilatus-1Eng Cert Dec 2022.pdf

Pilatus-1Eng Cert Dec 2022

Disclosure of Sold Unsold Pil 1 Dec 2022.pdf

Disclosure Of Sold Unsold Pil 1 Dec 2022

Pilatus 1 RERA Eng Cert till 26-04-2023.pdf

Pilatus 1 Rera Eng Cert Till 26-04-2023

Form 3 Ca Certicate MAr-23.pdf

CA Certificate (Form 3)

Disclosure of Sold Unsold Pil 1 Mar 2023.pdf

Disclosure Of Sold Unsold Pil 1 Mar 2023

Form 1 2017 Sep.pdf

Form 1 2017 Sep

Form 2 2017 Sep.pdf

Form 2 2017 Sep

Form 3 2017 Sep.pdf

Form 3 2017 Sep

Form 1 2017 Sep.pdf

Form 1 2017 Sep

Form 2 2017 Sep.pdf

Form 2 2017 Sep

Form 3 2017 Sep.pdf

Form 3 2017 Sep

DSUI.pdf

Dsui

Form 3 2022 Mar.pdf

Form 3 2022 Mar

Form 1 2018 June.pdf

Form 1 2018 June

Form 2 2018 June.pdf

Form 2 2018 June

Form 3 2018 June.pdf

Form 3 2018 June

DSUI 2018.pdf

Dsui 2018

Form 1 2018 Sep.pdf

Form 1 2018 Sep

Form 2 2018 Sep.pdf

Form 2 2018 Sep

Form 3 2018 Sep.pdf

Form 3 2018 Sep

Form 1 2021 Sep.pdf

Form 1 2021 Sep

Form 2 2021 Sep.pdf

Form 2 2021 Sep

Form 3 2021 Sep.pdf

Form 3 2021 Sep

DSUI 2021.pdf

Dsui 2021

Form 1 2021 Dec.pdf

Form 1 2021 Dec

Form 2 2021 Dec.pdf

Form 2 2021 Dec

LAYOUT-1.pdf

Layout-1

Q3_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

layout.pdf

Layout

15-1_opt.pdf

Sanctioned Building / Layout Plan

121212212.pdf

Declaration Form B

Form 2 Eng Cert Pil 1 Dec 2024.pdf

Engineer Certificate (Form 2)

p1-ilovepdf-compressed.pdf

Sanctioned Building / Layout Plan

Form 3 RERA Certificate Pilatus 1 Dec 2024.pdf

CA Certificate (Form 3)

Pilatus 1 Arch Form 1 March 2019.pdf

Pilatus 1 Arch Form 1 March 2019

Form 2 Engg Cert Pilatus 1 March 2019.pdf

Form 2 Engg Cert Pilatus 1 March 2019

MONTH SOUTH Ca Cert PILATUS 1_Mar19.pdf

CA Certificate (Form 3)

DSUI PILATUS 1_Mar19.pdf

Dsui Pilatus 1 Mar19

Form 1 Arc Cert Pil 1 Jun 2019.pdf

Form 1 Arc Cert Pil 1 Jun 2019

Form 3 Ca Cert Pil 1 Jun 2019.pdf

CA Certificate (Form 3)

Form 2 Engg Cert Pil 1 Jun 2019.pdf

Form 2 Engg Cert Pil 1 Jun 2019

MS-Title Certificate with Addendum.pdf

Legal Title report

Certificate - Change of Registered Office.PDF

Other

DSUI PILATUS 1 SEP 20.pdf

Dsui Pilatus 1 Sep 20

DSUI 2022.pdf

Dsui 2022

Form 1 Arc Cert Pil 1 Sep 2020.pdf

Form 1 Arc Cert Pil 1 Sep 2020

Form 1 Arc Cert Pil 1 Dec 2020.pdf

Form 1 Arc Cert Pil 1 Dec 2020

Form 2 Engg Cert Pil 1 Dec 2020.pdf

Form 2 Engg Cert Pil 1 Dec 2020

MONTE SOUTH PILATUS 1 RERA CA CERTI AS ON SEP 20.pdf

CA Certificate (Form 3)

Form3 Ca Cert Pil 1 June 24.pdf

CA Certificate (Form 3)

Montesouth 4 Jun 2024.pdf

Montesouth 4 Jun 2024

Form 2 Eng Cert Pil 1 Mar 24.pdf

Form 2 Eng Cert Pil 1 Mar 24

Disclosure Sold Unsold Inventory Pil Mar 2024.pdf

Disclosure Sold Unsold Inventory Pil Mar 2024

Disclosure of Sold Unsold Pil 1 Jun 2022.pdf

Disclosure Of Sold Unsold Pil 1 Jun 2022

Form 1 2020 June.pdf

Form 1 2020 June

Form 2 2020 June.pdf

Form 2 2020 June

Form 3 2020 June.pdf

Form 3 2020 June

DSUI 2020.pdf

Dsui 2020

FORM B MONTE SOUTH PILATUS 1 .pdf

Declaration Form B

Form 1 Arc Cert Pil 1 Sep 2017.pdf

Form 1 Arc Cert Pil 1 Sep 2017

DSUI Pil 1 Jun 2019.pdf

Dsui Pil 1 Jun 2019

Form 1 Arc Cert Pil 1 Sep 2019.pdf

Form 1 Arc Cert Pil 1 Sep 2019

Q1_AC_Form-1_Pilatus-1_2024.pdf

Q1 Ac Form-1 Pilatus-1 2024

DSUI Pil 1 Sep 2017.pdf

Dsui Pil 1 Sep 2017

Form 3 CA Certificate Pil-1 Mar 2020.pdf

CA Certificate (Form 3)

DSUI PIL-1 Sep 2019.pdf

Dsui Pil-1 Sep 2019

Form 1 Arc Cert Pil 1 Dec 2019.pdf

Form 1 Arc Cert Pil 1 Dec 2019

Pilatus ca cert Q3 19-20.pdf

CA Certificate (Form 3)

DSUI Pilatus Q3 19-20.pdf

Dsui Pilatus Q3 19-20

Form 1 Arc Cert Pil 1 Mar 2020.pdf

Form 1 Arc Cert Pil 1 Mar 2020

DSUI Pil-1 Mar 2020.pdf

Dsui Pil-1 Mar 2020

Form 3 CA Cert PIL-1 Sep 2019.pdf

CA Certificate (Form 3)

DSUI PILATUS-1 DEC 20 (1).pdf

Dsui Pilatus-1 Dec 20 (1)

Form 2 Engg Cert Pil 1 Jun 2021.pdf

Form 2 Engg Cert Pil 1 Jun 2021

DSUI Pil-1 Mar 2021.pdf

Dsui Pil-1 Mar 2021

Montesouth 4 Sep 2024.pdf

Montesouth 4 Sep 2024

Form 3 Ca Cert Pil 1 Sep 2017.pdf

CA Certificate (Form 3)

Q3_AC_Form-1_Pilatus-1_2024.pdf

Q3 Ac Form-1 Pilatus-1 2024

DSUI PILATUS-1DEC 20.pdf

Dsui Pilatus-1Dec 20

Form 1 Arc Cert Pil 1 Mar 2021.pdf

Form 1 Arc Cert Pil 1 Mar 2021

Form 2 Engg Cert Pilatus 1 March 21.pdf

Form 2 Engg Cert Pilatus 1 March 21

Form 2 Eng Certificate Pilatus 1 MAR 2025.pdf

CA Certificate (Form 3)

202503 RERA Certificate Montesouth Tower B Pilatus 1 - Form 3.pdf

CA Certificate (Form 3)

Montesouth 4 Mar 2025.pdf

Montesouth 4 Mar 2025

Montesouth 4 Jun 2025.pdf

Montesouth 4 Jun 2025

PILATUS-1_RERA CERTI _DEC 20.pdf

Pilatus-1 Rera Certi Dec 20

Disclosure Sold Unsold Inventory Pil Jun 2023.pdf

Disclosure Sold Unsold Inventory Pil Jun 2023

P6.pdf

PAN Card

Disclosure Sold Unsold Inventory Pil Dec 2023.pdf

Disclosure Sold Unsold Inventory Pil Dec 2023

Form 3 Ca Certificate Pil-1_ JUN23.pdf

CA Certificate (Form 3)

Form 2 Eng Cert Pil 1 Sep 23.pdf

Form 2 Eng Cert Pil 1 Sep 23

Form 2cEnginee Certificate Monte South Pilatus 1 Dec 2024.pdf

CA Certificate (Form 3)

Form3 Ca Cert Pil 1 June 24.pdf

CA Certificate (Form 3)

MONTH SOUTH Ca Cert PILATUS 1_Mar19.pdf

CA Certificate (Form 3)

2 Engineer's Certificate Pilatus 1 June 2024.pdf

Engineer Certificate (Form 2)

PayentReceipt_Print638515396625630288.pdf

Other – Finance

Q3_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

Q2_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

MONTH SOUTH Ca Cert PILATUS 1_Mar19.pdf

CA Certificate (Form 3)

Form 3 Ca Certi PIL-1 Sep 2024.pdf

CA Certificate (Form 3)

Form3 Ca Cert Pil 1 June 24.pdf

CA Certificate (Form 3)

MONTH SOUTH Ca Cert PILATUS 1_Mar19.pdf

CA Certificate (Form 3)

2 Engineer's Certificate Pilatus 1 June 2024.pdf

Engineer Certificate (Form 2)

Form 2 Engg Cert Pilatus 1 SEP 2024.pdf

Engineer Certificate (Form 2)

2 Engineer's Certificate Pilatus 1 June 2024.pdf

Engineer Certificate (Form 2)

Form 2_Engg Certificate Pilatus 1 Dec 24.pdf

Engineer Certificate (Form 2)

Engineer's Certificate_Monte South Pilatus-1 Dec 2024.pdf

Engineer Certificate (Form 2)

Form 3 CA Cert pilatus-1 Dec 2024.pdf

CA Certificate (Form 3)

Form 3 Ca Certi PIL-1 Sep 2024.pdf

CA Certificate (Form 3)

Form 3 RERA Certificate Pilatus 1 Dec 2024.pdf

CA Certificate (Form 3)

Form 2 Engg Cert Pil 1 Jun 2022.pdf

Form 2 Engg Cert Pil 1 Jun 2022

Q1_AC_Form-1_Pilatus-1_2023.pdf

Q1 Ac Form-1 Pilatus-1 2023

Form 3 2021 Dec.pdf

Form 3 2021 Dec

Form 2 2022 Mar.pdf

Form 2 2022 Mar

202506 RERA Certificate Montesouth Tower B Pilatus 1 - Form 3.pdf

CA Certificate (Form 3)

Montesouth 4 Dec 2024.pdf

Montesouth 4 Dec 2024

DSUI 2021.pdf

Dsui 2021

Form 1 2022 Mar.pdf

Form 1 2022 Mar

Pilatus-1 RERA Eng certificate till 3-08-2023.pdf

CA Certificate (Form 3)

DSUI.pdf

Dsui

Form 2 Engg cert Pilatus 1 - June 2024 MS 4.pdf

Form 2 Engg Cert Pilatus 1 - June 2024 Ms 4

Form 3 Ca Cert PIL-1 Sep 23.pdf

CA Certificate (Form 3)

Piltaus -1 Form 3 Dec 2022.pdf

Piltaus -1 Form 3 Dec 2022

Form 3 RERA Certificate Pilatus 1 Dec 2018.pdf

CA Certificate (Form 3)

DSUI 2018 - Sep.pdf

Dsui 2018 - Sep

Q1_AC_Form-1_Pilatus-1_2025.pdf

Q1 Ac Form-1 Pilatus-1 2025

Q4_AC_Form-1_Pilatus-1_2024.pdf

Q4 Ac Form-1 Pilatus-1 2024

Q4_AC_Form-1_Pilatus-1_2025.pdf

Q4 Ac Form-1 Pilatus-1 2025

Q3_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

Q2_AC_Form-1_Pilatus-1_2024.pdf

Q2 Ac Form-1 Pilatus-1 2024

Form 3 CA Certificate Pil-1 Mar 24 Revised.pdf

CA Certificate (Form 3)

Form 3 CA Cert PIL-1 Sep 2024.pdf

CA Certificate (Form 3)

Form 2 Engg Cert Pilatus 1 March 2020.pdf

Form 2 Engg Cert Pilatus 1 March 2020

Form 2 Engg Cert -Pilatus 1-Dec19.pdf

Form 2 Engg Cert -Pilatus 1-Dec19

Form 2_Engg Cert Pilatus 4 SEP 2024.pdf

Form 2 Engg Cert Pilatus 4 Sep 2024

Form 3 CA Certificate Pil-1 Mar 2021.pdf

CA Certificate (Form 3)

Pilatus 1 Arch Form1 DEC 2018.pdf

Pilatus 1 Arch Form1 Dec 2018

Pilatus -1 Arch Form 1 june 2021.pdf

Pilatus -1 Arch Form 1 June 2021

Form 3 Ca Cert Pil 1 Jun 2021.pdf

CA Certificate (Form 3)

Form 2 Engg Cert Pil 1 Sep 2017.pdf

Form 2 Engg Cert Pil 1 Sep 2017

Form 2 Engg Cert Pil 1 Sep 2020.pdf

Form 2 Engg Cert Pil 1 Sep 2020

Form 2 Engg Cert Pil 1 Dec 2018.pdf

Form 2 Engg Cert Pil 1 Dec 2018

Form 3 Ca Certi PIL-1 Sep 2024.pdf

CA Certificate (Form 3)

Form 2 Eng Cert Pil 1 Dec 2023.pdf

Form 2 Eng Cert Pil 1 Dec 2023

Form 2 Engg Cert Pil 1 Sep 2019.pdf

Form 2 Engg Cert Pil 1 Sep 2019

Form 3 Ca Cert Pil 1 Jun 2022.pdf

CA Certificate (Form 3)

Form3 Ca Cert Pil 1 June 24.pdf

CA Certificate (Form 3)

Q2_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

Q2_AC_Form-1_Pilatus-1_2022.pdf

Q2 Ac Form-1 Pilatus-1 2022

Q3_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

Q4_AC_Form-1_Pilatus-1_2023.pdf

Q4 Ac Form-1 Pilatus-1 2023

Q2_AC_Form-1_Pilatus-1_2024.pdf

Architect Certificate (Form 1)

DSUI Pilatus 1 Dec 2018.pdf

Dsui Pilatus 1 Dec 2018

Explore 3D

Fly the locality in photoreal 3D

Orbit the building, explore nearby context, then enter a floor.

Loading 3D locality…

Location & Connectivity

Ward E, Mumbai City, MAHARASHTRA

Open in Google Maps

Ward E Micro-Market Capital Trend

+43% 5-Yr Growth

Registered transaction rate per sq.ft based on statutory title deeds and micro-market filings.

2026 Registered Rate

₹7,200 / sq.ft

202120222023202420252026

5-Yr Capital Gain

+43%

~7.6% Annualized CAGR

Gross Rental Yield

3.7%

~₹22/sq.ft monthly rental

Infrastructure Driver

Ward E

High Growth Corridor · Highway & Railway Connectivity

Official Statutory Pricing

Price on Request

Government filings verify 34 unsold units remaining in this development.

Designated Escrow Bank

HDFC BANK

Active
IFSC Code:HDFC0000015
Branch:

RATAN GALAXIE JUNCTION OF J N RD AND GOSHALA RD MULUND WEST

Section 4(2)(l)(D) compliant: 70% of buyer payments are legally ring-fenced for this project only.